Bridge Placement Lift Holleschbierg, Hesperange (LUX)

On the occasion of the bridge placement on September 14, the 38-metre-long steel bridge of Lift Holleschbierg was successfully lifted into place.

 

The new passerelle connects the elevator tower with the Holleschbierg plateau and thus creates a direct link to the sports infrastructure there.

 

Our video from bird's eye persepctive shows the impressive teamwork of everyone involved during the challenging lifting process.

 

 

 

 

Video: ©Janina Abel-Bernat

Fotos: ©1111 Photography

 

 


Share on