Construction site visit at the Ariston, Esch-sur-Alzette (LUX)

On Wednesday, 14.07, we welcomed the Escher communal council to the construction site of the Ariston to present the current status of the works during a guided tour.

 

Carole Lorang, director of the Escher Theatre, introduced the tour with a short speech on the future of the Ariston as a new cultural location.

 

At the moment, the façade renovation and the removal of the exterior plaster are pending before work begins on the substructure of the acoustic pre-wall in the theatre hall and the installation of the cooling lid sails.

 

 

Photo 1: © Ville d'Esch-sur-Alzette

 


Share on