Category :
Education + Research + Learning
Project :
Demolition and reconstruction of the existing heritage-listed stairway of the Humboldt-Gymnasium in Trier
Client :
Stadt Trier
Country :
Germany
Area :
ufa 50 m²
Start of planning :
06/2014
Realisation :
04/2015 - 10/2015
Assignment :
Complete architecture services
Share on
project Demolition and reconstruction of the existing heritage-listed stairway of the Humboldt-Gymnasium in Trier client City of Trier (GER) complete architecture services WW+, Esch-sur-Alzette/Trier (LUX/GER) structural engineering Ing. Büro Robert, Trier (GER) ufa 50 m² net construction cost 120.194 € start of planning 06/2014 realisation 04/2015 - 10/2015
Design concept
In collaboration with the Denkmalpflegeamt (Office for the Preservation of Historic Buildings and Monuments) of the City of Trier, the existing stairway of the Humboldt-Gymnasium in Trier was demolished and reconstructed in compliance with historic preservation guidelines. The stairway features two self-supporting flights of stairs and an entrance landing. The construction consists of exposed concrete cantilever arms and stairway beams, which support the static loads independently of the existing building. The treads and landing are individual precast concrete elements with basalt fibres that have been placed on top of the substructure.
- Treppenanlage am Humboldt-Gymnasium Trier eng
- Treppenanlage am Humboldt-Gymnasium Trier ger
Downloads
Contact us !